Posts in Architecture
University Cooperative School Schematic Design

This past weekend was our first public presentation of the schematic design for the University Cooperative School.  We are working with the school to develop an indoor active space as well as music studio in the basement, while taking the opportunity to improve the entry sequence and experience for the 3rd-5th grade classrooms. University Cooporative School Reconfiguring the entry with the new stairs and an eddy space for the kids cubby space helps bring light to the active space below, while a window wall separates the noisier activities of the cubbies and active spaces below from the classrooms. The new entry exposes the admin office to the entry, making it both more public, as well as increasing oversight at the entry.

University Cooporative School The open stairs on the south side of the building will help bring light to the back side of the basement, while a translucent wall on the west side brings in light from the on grade entrance, with a new accessible ramp and stair entry from the south west corner.

UCS PERSPECTIVE SECTIONThe Music room is located in the below grade section to the East, taking advantage of the inherent acoustic dampening of the concrete foundation and lid, while allowing for a light well between the cubbies and south window wall.

UCS ENTRY FINAL

A view from the new entry, with the cubby alcove, stairs down, and a pattern of translucent colored circular insets in the concrete slab create a playful musical pattern, alluding to the music studio below, while allowing light to be transferred downstairs.

UCS CLASSROOM FINALA new stage with sliding white board, allows for visual separation between the upper and lower classrooms, while fostering performance as an integral component of the curriculum. A low bank of cabinets gives privacy between the bathrooms, and classroom, maintaining the openness of the space for public gatherings, and providing additional storage.

UCS ACTIVE FINAL The active space, with new beams, eliminates the intermediate columns, increasing the flexibility of the space for larger scale activities.  New rubberized flooring and gymnasium wall pads create a safe environment for physical activities.

UCS MUSIC ROOM FINAL The music room with dedicated storage for instruments, and acoustic isolation from the classrooms, allows for music to continue to play a central roll in the school, while minimizing the disruption to the classrooms.

 

CLUBHOUSE EXTERIOR CLADDING ALMOST FINISHED!

The exterior finishes over at the Clubhouse are almost done... The cladding is a combination of fiber cement panels and a clear cedar rain screen. This is a photo taken from the street, the panels are installed with horizontal anodized aluminum panel breaks at 2' on center:

construction-0

A master suite is clad in a clear cedar rainscreen, it cantilever's over an outdoor room below:

construction-4

Closeup of the cedar rainscreen:

construction-1

SUN MEADOW ESCAPE CONSTRUCTION PHOTOS - INSTALLING ALUMINUM CEILING PANELS

The ceilings and soffits will be high gloss white aluminum panels. We installed a plywood underlayment to simplify panel layout and minimize panel distortion.

All photos are courtesy of Phil Dietz / Lost River Construction.

This photo is looking down the entry veranda toward the front door:

construction-5

Looking from the front door toward the sauna wing and entry veranda:

construction-3

Completed plywood underlay in the great room:

construction-4

First panels go up in the Master bedroom:

construction-1

Master bedroom ceiling complete:

construction-7

Detail of fasteners:

construction-8

Recent rendering put together for an advertisement:

rendering

 

 

 

Box wall

box-wall-1We finally have finished our plywood box wall! The light catches the plywood grain a little differently, highlighting the alternating orientation.box-wall-2Custom steel stairs to the mezzanine pinned off the concrete, are the next undertaking. cast architecture office plywood box wall

The depth of the boxes are modulated to create niches for models, samples and audiovisual equipment.

Saratoga Residence under construction

saratoga residence

 Construction on the Saratoga Residence is proceeding very well, and the overall massing is taking shape.  We should have the rest of the steel installed in the next couple of weeks, then all the back up framing can be removed an we'll really be able to show off the open plan, but for now here is a view of the future garden in foreground and mudroom:

Saratoga residence design by Matt Hutchins and CAST steel moment frame

Sun Meadow Escape construction update

A vacation retreat in Mazama Washington that emphasizes a seamless flow between the indoors and outdoors, clean lines, and an indestructible materials pallet. After a long summer of groundwork and extensive concrete formwork the framing has begun - the Sun Meadow Escape is taking shape!

View of the northwest corner of the home. A large covered patio adjacent to the public areas of the home allows activities to flow seamlessly from the indoors to the outdoors.

 

A private master suite at the southeast corner nestles up against the adjacent aspen grove.